News Center

our commitment to nickbaler
Position:Home > News Center <<    Return
Operation process of waste paper Baling Press
Author : admin Time : 20-06-15 AllPageView : 964

1. This product is used for packaging of waste paper. The operator must operate according to the operation regulations.

2. The hydraulic oil must be added to the specified oil level line before use (46# hydraulic oil).

3. Before starting the hydraulic pump, check the circuit for incorrect connections or leaks.

4. The surroundings of the hydraulic anti-packing plate should be cleaned in time for each anti-packing to prevent jamming.

5. When packing, the operator must pay attention to safety, spread the paper evenly, place the paper in place, and close the door of the box lid before packing.

6. The hydraulic operating handle should be quickly pushed to the designated position when packing to prevent the hydraulic operating handle from being quickly pushed to the designated position when packing the valve. The hydraulic operating handle should be quickly pushed to the designated position when packing and the hydraulic oil flow is not enough, causing the motor to over The current causes the motor to overcurrent. A blockage and insufficient hydraulic oil flow can cause the motor to overflow.

7. After packing, all hydraulic rods must be retracted into the hydraulic cylinder to prevent dust from damaging the sealing ring and leaking oil.

mmexport1555663937574.jpg

8. Regularly perform maintenance work and find a mechanic to deal with any leakage in the oil pipe immediately.

9. If an abnormality is found, the operation should be stopped immediately and the cause can be eliminated.

10. After the lid door is opened, it is strictly forbidden to press the door to prevent accidents.

11. Oil pressure: It is strictly forbidden to adjust the pressure without permission. The operator must work under the adjusted oil pressure, and the maximum pressure limit is 30MPa. ?

12. The oil in the oil tank must be strictly filtered and always maintain a sufficient amount of oil. The oil tank should be cleaned and replaced every six months.

13. The lubricating parts of the machine should be filled with lubricating oil at least once a day as required, and the debris in the chamber should be cleaned once per shift.

14. Those who do not understand the main machine structure, performance and operation rules shall not start the machine without permission. When multiple people operate at the same time, the division of labor should be clear to avoid the risk of misoperation.

15. When the machine has serious oil leakage or abnormal phenomena during work, it should be stopped immediately. Don't look at the place where the oil is sprayed, do not block it directly with your hands, and do not force it to run.

16. When the machine is running or packing, it is not allowed to repair or touch moving parts by hand, and it is strictly forbidden to press the materials in the bin with hands or feet.

17. When adjusting pumps, valves and pressure gauges, an experienced technician must carry out. If the pressure gauge is found to be faulty, it should be repaired or replaced immediately.

18. This machine uses 46# anti-wear oil, always pay attention to the oil temperature, and stop it when it exceeds 75℃.

19. When the lid cylinder handle is pulled to the return position when turning the bag, push the anti-bag handle again.

for more information ,please visit : www.nickbaler.net 


Recommended news
Recommended products
  • OCC Baler Machine/Old Corrugated Cardboard Baler
  • RDF baler's maintance
  • MSW Vertical Baler Machine
  • MSW Environmental protection equipment
Recommended Assorises
  • Cyclone Separator
  • Diesel engine generator
  • Forklift Car
  • Wire Buckle For Baling
  • Iron Wire For Baling
  • Ton Bags/Jumbo Bag

Contact Us

  • +86 29 86031588   (Fax)
  • 008615021631102
  • ligoodboy2010
  • info@nkbaler.com
  • East Qunsheng Road Wuxi City,Jiangsu,China

Inquiry Us

Copyright © 2019 NICKBALER .rights reserved sitemap.html
Whats App Skype Shaanxi Nick Machinery
Equipment Co. LTD
go back to the top